top of page

Experienced highway professionals 

OTHER LOCAL PROJECTS

OUR FACTS

BARHALES, BIRMINGHAM RESILIENCE PROJECT

• Supply of 80,000 tonnes of recycled 6F2 aggregate to the 33 road crossings between Stourport and Frankly.

 

• This was required in order to create access points to enable pipes to be delivered to the fields.

 

• Supply of vehicles to carry out the haulage of materials from various sites along the 26km pipeline to other points. • Removal of sands generated from various tunnelling operations including the 520m Wilden tunnel.

 

• Removal of aggregate from road crossings after the installation of the pipes. This material was returned to Wilden and recycled for the second time.

Lorry icon.png

15 OWNED LORRIES

Staff icon.png

25 STAFF

MEMBERS

School icon.png

15 SCHOOLS

SERVICED

Rocks icon.png

1000s TONNES

CRUSHED CONCRETE

soil icon.png

1000s TONNES TOP SOIL RECYCLED

ENQUIRE FOR A QUOTE TODAY!

bottom of page