top of page

Construction work around schools

WORCESTERSHIRE SCHOOLS

In the past 5 years Talbot Transport are proud to be have been directly involved in the construction works of schools throughout Worcestershire. Below is a summary of some of the more challenging jobs.

REDHILL CHURCH OF ENGLAND

PRIMARY SCHOOL

The existing Redhill Primary School needed to be expanded in order to double the intake of pupils per academic year. The works involved are a six classroom extension, and an extension to the school frontage and internal alterations.

 

• Additional hard play areas and staff parking was also required.

 

• Our involvement included the removal of excavated and demolished materials and the supply of both Recycled and Quarried Aggregates, with Topsoil supplied for final landscaping details.

OUR FACTS

HARTLEBURY CHURCH OF ENGLAND PRIMARY SCHOOL

• Removal of demolished structures

 

• Removal of excavated material from footings for new two story building extension.

 

• Supply of both Quarried and Recycled Type 1 stone.

 

• Supply of Top Soils for landscaping.

​

The access to this site was particularly limiting. Our smaller six wheel vehicles enabled access as well as reduced weight on existing driveways. 

Lorry icon.png

15 OWNED LORRIES

Staff icon.png

25 STAFF

MEMBERS

School icon.png

15 SCHOOLS

SERVICED

Rocks icon.png

1000s TONNES

CRUSHED CONCRETE

soil icon.png

1000s TONNES TOP SOIL RECYCLED

ENQUIRE FOR A QUOTE TODAY!

bottom of page